The Summit Center Courtyard
Site preparation and minimal asphalt removal. Installation of new concrete pavement, poured in place rubber surfacing, and artificial turf, chain link and wood composite fence with gates, concrete curb, and site furniture; Installation of new ADA compliant concrete ramp with handrail; installation of shade structures (Purchased by owner) and foundations
00 Full Set of Specs
(click to expand/collapse)
Name | Size | ||
54647-1_OUTPUT_Spec | 1.9 MB |