The Summit Center Courtyard
Site preparation and minimal asphalt removal. Installation of new concrete pavement, poured in place rubber surfacing, and artificial turf, chain link and wood composite fence with gates, concrete curb, and site furniture; Installation of new ADA compliant concrete ramp with handrail; installation of shade structures (Purchased by owner) and foundations
Addendum 01
(click to expand/collapse)
Name | Size | ||
Addendum #1 | 1.9 MB |
Addendum 02
(click to expand/collapse)
Name | Size | ||
Addendum #2 | 1.1 MB |
Addendum 03
(click to expand/collapse)
Name | Size | ||
Addendum #3 | 1.6 MB |
Addendum 04
(click to expand/collapse)
Name | Size | ||
Addendum #4 | 553.3 KB |