ECWA Water System Improvements 36 & 42-Inch Transmission Main Replacement Project

Installation of approximately 2,800 linear feet of 42-inch PCCP pipe and appurtenances between Ball Pump Station and the south side of Ditch 5B, approximately 1,450 linear feet of 36-inch PCCP pipe and appurtenances between the south side of Ditch 5B and north of Millersport Highway, and approximately 1,750 linear feet of 36-inch PCCP pipe and appurtenances between the south side of Frankhauser power station and the south side of the I-290 West Off-Ramp
00 Full Set of Specs (click to expand/collapse)
Name Size
241011 ECWA W30 100% Manual 11.2 MB