ECWA Water System Improvements 36 & 42-Inch Transmission Main Replacement Project
Installation of approximately 2,800 linear feet of 42-inch PCCP pipe and appurtenances between Ball Pump Station and the south side of Ditch 5B, approximately 1,450 linear feet of 36-inch PCCP pipe and appurtenances between the south side of Ditch 5B and north of Millersport Highway, and approximately 1,750 linear feet of 36-inch PCCP pipe and appurtenances between the south side of Frankhauser power station and the south side of the I-290 West Off-Ramp
Addendum 01
(click to expand/collapse)
Name | Size | ||
Addendum01 | 6.5 MB |
Geotechnical Report
(click to expand/collapse)
Name | Size | ||
ATL No. BD046E-01-06-23 Wendel - ECWA Contract W-30 | 15.8 MB |
Pre-Bid Meeting Minutes
(click to expand/collapse)
Name | Size | ||
241104 W030 Pre-Bid Mtg Minutes | 213.7 KB |