ECWA Water System Improvements 36 & 42-Inch Transmission Main Replacement Project
Installation of approximately 2,800 linear feet of 42-inch PCCP pipe and appurtenances between Ball Pump Station and the south side of Ditch 5B, approximately 1,450 linear feet of 36-inch PCCP pipe and appurtenances between the south side of Ditch 5B and north of Millersport Highway, and approximately 1,750 linear feet of 36-inch PCCP pipe and appurtenances between the south side of Frankhauser power station and the south side of the I-290 West Off-Ramp
Status
Bidding Closed
Prebid Date | 11/4/24 10:00am |
Bid Date | 11/19/24 10:00am |
Location
Town of Amherst, New York
This project requires a non-refundable fee of $190 made payable to Avalon.
This project is hard copy only, electronic download option not available.