Village of Holley High Street Waterline Replacement
Installation of 1,400 lineal feet of new 8 inch diameter PVC waterline by open cut excavation; connections to existing water mains; removal and/or abandonment of existing waterlines & appurtenances; placing the new waterlines into service
00 Full Set Plans
(click to expand/collapse)
Name | Size | ||
50007-1_OUTPUT_Drawings | 34.4 MB |