Village of Holley High Street Waterline Replacement

Installation of 1,400 lineal feet of new 8 inch diameter PVC waterline by open cut excavation; connections to existing water mains; removal and/or abandonment of existing waterlines & appurtenances; placing the new waterlines into service
Addendum 01 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
(V) Holley High Street WL Addendum No. 1 319.5 KB
Addendum 02 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
(V) Holley High Street WL Addendum No. 2 249.4 KB