VILLAGE OF BLASDELL ADA IMPROVEMENTS AT VILLAGE HALL
The work for Contract 23-1 involves removal of the existing concrete sidewalks, stairs, ramp and railings. The work includes installation of new concrete sidewlaks, stairs, ramp and railings.
00 Full Set Spec
(click to expand/collapse)
Name | Size | ||
36864-1_OUTPUT_Spec | 3.0 MB |