VILLAGE OF BLASDELL ADA IMPROVEMENTS AT VILLAGE HALL
The work for Contract 23-1 involves removal of the existing concrete sidewalks, stairs, ramp and railings. The work includes installation of new concrete sidewlaks, stairs, ramp and railings.
00 Full Set Plans
(click to expand/collapse)
Name | Size | ||
36864-1_OUTPUT_Drawings | 4.4 MB |