Route 96 Pump Station

Project involves the replacement of pressure piping and valving in the existing pump station. All steel or metal components that are removed are to be turned over to the Owner. New piping, tees, bends or other fittings to be ductile iron with factory coating. Coating requirements are in the specifications. Coating on site is not to be done unless touch up coating is needed. Valves to be coated as well. The station must remain operational during the work. Any pipe removed shall be replaced by the end of each work day and be operational. Other station accessories are included in the scope of work