Route 96 Pump Station
Project involves the replacement of pressure piping and valving in the existing pump station. All steel or metal components that are removed are to be turned over to the Owner. New piping, tees, bends or other fittings to be ductile iron with factory coating. Coating requirements are in the specifications. Coating on site is not to be done unless touch up coating is needed. Valves to be coated as well. The station must remain operational during the work. Any pipe removed shall be replaced by the end of each work day and be operational. Other station accessories are included in the scope of work
Plan Holders
Date | Company | Contact |
4/18/25 12:28 pm |
ACE Great Lakes
10601 Royal Oak Dr Clarence, NY 14031 |
Zachary Hein
President
Tel: 716-796-4067
Fax: 301-490-9100
|
4/16/25 4:25 pm |
Avalon
89 Allen Street Rochester, NY 14608 |
Rochester Serivce
Tel: 585-242-9999
Fax: 585-242-9994
|
4/16/25 4:28 pm |
Builder's Exchange - Syracuse
6563 Ridings Rd Syracuse, NY 13206 |
Monica Noble
Tel: 315-437-9936
|
4/16/25 4:26 pm | Builders Exchange |
Nicole G
Tel: 585-586-5460
|
4/16/25 4:29 pm |
Builders Exchange of the Southern Tier - West
65 East Main Street Falconer, NY 14733 |
BEST West
Plan Room
Tel: 716-665-4026
Fax: 716-665-6350
|
4/16/25 4:28 pm |
Construction Exchange of Buffalo
2660 William Street Cheektowaga, NY 14227 |
Joel Brinson
Plan Room Coordinator
Tel: 716-874-3435
Fax: 716-875-4412
|
4/16/25 4:29 pm |
Dodge Construction Network
2860 South State Hwy 161 - Suite 160 - #501 Ste 160 #501 Grand Prairie, TX 75052 |
William Fleming
Document Coordinator
Tel: 8443263826
Fax: 6093362767
|
4/16/25 4:25 pm | MRB Group |
Patrick Nicoletta
|