Water Treatment Plant Electrical Service Upgrade

Project consists of upgrading two existing high voltage electrical services, including switchgear, and metering. Removal of existing electrical feeders service entrance switch-gear and utility metering equipment. Modifications in former electrical service room, and addition of second floor and stairs
Addendum 01 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum #1 4.1 MB
Addendum 02 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum #2 3.1 MB
Addendum 03 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum #3 1.1 MB