Water Treatment Plant Electrical Service Upgrade
Project consists of upgrading two existing high voltage electrical services, including switchgear, and metering. Removal of existing electrical feeders service entrance switch-gear and utility metering equipment. Modifications in former electrical service room, and addition of second floor and stairs
Addendum 01
(click to expand/collapse)

Name | Size | ||
Addendum #1 | 4.1 MB |
Addendum 02
(click to expand/collapse)

Name | Size | ||
Addendum #2 | 3.1 MB |
Addendum 03
(click to expand/collapse)

Name | Size | ||
Addendum #3 | 1.1 MB |