Dunkirk City School District - 2024/2025 Capital Outlay Project - Intermediate School (Re-Bid)
RTU replacement, electrical and control work
Addendum 01
(click to expand/collapse)
Name | Size | ||
00 41 00- Bid Form | 63.0 KB | ||
230529 - Hangers and Supports for HVAC Piping and Equipment | 164.3 KB | ||
230553 - Identification of Mechanical Systems | 71.8 KB | ||
230593 - Testing, Adjusting and Balancing | 85.1 KB | ||
230993 - Sequences of Operation | 76.0 KB | ||
231123 - Facility Natural-Gas Piping | 130.7 KB | ||
237413 - PACKAGED ROOFTOP UNITS | 90.6 KB | ||
260519 FL - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES | 109.9 KB | ||
AFB - rebid | 67.7 KB | ||
Bid Addendum No. 01 | 140.7 KB | ||
E101 ELECTRICAL PLAN | 567.0 KB | ||
M-001 MECHANICAL LEGENDS | 2.6 MB | ||
M-104 PARTIAL THIRD FLOOR PLAN - MECHANICAL | 1.2 MB | ||
M-501 MECHANICAL DETAILS AND SCHEDULES | 1.4 MB |