City of Batavia 2021 Infrastructure Improvement Project

Installation of approximately 5,000 LF of 12-inch watermains and 2,100 LF of 8-inch watermains
00 Full Set Plans (click to expand/collapse)
Name Size
54429-1_OUTPUT_Drawings 11.4 MB