Grand Island Capital Outlay Project 2024-25

The work includes adding a booster pump pack at the middle and high school to increase water pressure to the spark arrestors at the existing dust collection systems and modifying ductwork at the middle school to allow for the relocation of the flame detector
00 Full Set Spec (click to expand/collapse)
Name Size
54154-1_OUTPUT_Spec 5.0 MB