Earl W. Brydges Building - Niagara Falls Public Library - HVAC & Control Improvements
Alterations required for HVAC upgrades / replacement of the existing two-pipe HVAC system and equipment and providing a new building management system, associated demolition and hazardous materials abatement, replacements of existing ceiling systems, and replacement of existing delaminating fire proofing. The project will be constructed under coordinated, concurrent multiple contracts including HVAC, General, and Electrical Construction Contract Work
00 Full Set Plans
(click to expand/collapse)
Name | Size | ||
53823-1_OUTPUT_Drawings | 12.2 MB |
Architectural
(click to expand/collapse)
Name | Size | |||
003_Arch | 6.8 MB |
Electrical
(click to expand/collapse)
Name | Size | |||
005_Electrical | 1.0 MB |
General
(click to expand/collapse)
Name | Size | |||
001_General | 390.7 KB |
Hazardous Materials
(click to expand/collapse)
Name | Size | |||
002_HM | 2.2 MB |
Mechanical
(click to expand/collapse)
Name | Size | |||
004_Mech | 1.2 MB |