Earl W. Brydges Building - Niagara Falls Public Library - HVAC & Control Improvements

Alterations required for HVAC upgrades / replacement of the existing two-pipe HVAC system and equipment and providing a new building management system, associated demolition and hazardous materials abatement, replacements of existing ceiling systems, and replacement of existing delaminating fire proofing. The project will be constructed under coordinated, concurrent multiple contracts including HVAC, General, and Electrical Construction Contract Work
00 Full Set Plans (click to expand/collapse)
Name Size
53823-1_OUTPUT_Drawings 12.2 MB
Architectural (click to expand/collapse)
Order files below for $30.00 each
Name Size
003_Arch 6.8 MB
Electrical (click to expand/collapse)
Order files below for $30.00 each
Name Size
005_Electrical 1.0 MB
General (click to expand/collapse)
Order files below for $10.00 each
Name Size
001_General 390.7 KB
Hazardous Materials (click to expand/collapse)
Order files below for $20.00 each
Name Size
002_HM 2.2 MB
Mechanical (click to expand/collapse)
Order files below for $35.00 each
Name Size
004_Mech 1.2 MB