SUCF 031068-00 Renovate Moore Hall for Student Living Services

Interior building demolition; hazardous materials abatement; structural steel erection/modifications; roofing; site restoration; and building fitout, including complete mechanical, electrical, plumbing and fire protection work, as further described in the General Requirements, Section 01 11 00, Description of Work
Addendum 01 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum 1 7.9 MB
Addendum 02 (click to expand/collapse)
Addendum 03 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum 3 6.8 MB
Addendum 04 (click to expand/collapse)
For Information (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
031068-00_Moore_PreBId Walkthrough - Sign In Sheet (11-19-2024) 256.3 KB