Kenmore Police Department - Phase 2
The Kenmore Police Department project is a complete tear down of the existing Kenmore Police Station and the utilization of the existing property to build a new Police Station. The new ballistically rated (UL752 – Level 3) building will be a masonry load bearing system clad in face brick, stone, and ACM panel systems. The new Station will house the Kenmore Police Department and will include a new firing range
Addendum 01
(click to expand/collapse)
Name | Size | ||
21067.01 Kenmore Police Phase 2 - Addendum No. 1 - Cover Sheet | 2.0 MB | ||
Drawings | 16.8 MB | ||
Specifications | 467.7 KB |
Addendum 02
(click to expand/collapse)
Name | Size | ||
21067.01 Kenmore Police Phase 2 - Addendum No. 2 - Cover Sheet and RFI responses | 696.7 KB | ||
Drawings | 23.2 MB | ||
Specifications | 1.1 MB |
Addendum 03
(click to expand/collapse)
Name | Size | ||
Access Control Reference Documentation | 10.3 MB | ||
Addendum 3_Complete | 319.3 KB | ||
Drawings | 14.0 MB | ||
Specifications | 791.3 KB |
Post Bid Addendum 1
(click to expand/collapse)
Name | Size | ||
Post Bid Addendum 1_Complete | 122.9 KB |