Village of Gowanda WWTP Improvements and Aldrich Pump Stations Upgrades

New preliminary treatment facilities, new influent pump station, replacement of pumps at the Aldrich pump station, replacement of the primary sludge pumps, rehabilitation of the south secondary clarifier, new ultraviolet disinfection system, new piping and valves, associated site work, modifications to the SCADA system, mechanical heating and ventilation in the new preliminary treatment building, and electrical work for power and controls of the systems listed above
Addendum 01 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
240117 Addendum No 1 V Gowanda WWTP Aldrich PS 119.5 KB
Addendum 02 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
240126 Addendum No 2 V Gowanda WWTP Aldrich PS 6.1 MB
Addendum 03 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
240202 Addendum No 3 V Gowanda WWTP Aldrich PS 3.4 MB