Jamestown Public Schools Capital Project Phase 2 at Jamestown High School
1. Basement Renovation: Cafeteria, Kitchen, Corridors, Restrooms 2. 2nd Floor Renovation: Classrooms, Corridors, Restrooms, Offices 3. Roof Replacement & Recovery 4. Parking Lot Replacement 5. Miscellaneous areas of renovation including: Auditorium, IT Office, Gym, Secure Entrances 6. Building Systems: Fire Alarm, Cabling, Misc. Plumbing, Mechanical Upgrades
00 Full Set Plans
(click to expand/collapse)
Name | Size | ||
OUTPUT_Drawings Volume 1 | 76.8 MB | ||
OUTPUT_Drawings Volume 2 | 142.4 MB | ||
OUTPUT_Drawings Volume 3 | 59.6 MB | ||
OUTPUT_Drawings Volume 4 | 56.7 MB | ||
OUTPUT_Drawings Volume 5 | 38.4 MB |