Lehigh Valley Section House: Exterior Asbestos Abatement Phase 2

At the Lehigh Valley Section House, the work scope includes the following: Stabilization of the existing asbestos-containing exterior stucco, including cutting of new expansion joints in the stucco and remediation of cracking. Stucco and other asbestos-containing materials at window and door jambs and heads are also to be removed. Other miscellaneous work is also to occur as shown on the drawings.
Addendum 01 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Lehigh Valley Section House Exterior Asbestos Abatement Phase 2 Pre-Bid Walkthrough Sign-in Sheet 266.7 KB