Earl W. Brydges Building - Niagara Falls Public Library - HVAC & Control Improvements
Alterations required for HVAC upgrades / replacement of the existing two-pipe HVAC system and equipment and providing a new building management system, associated demolition and hazardous materials abatement, replacements of existing ceiling systems, and replacement of existing delaminating fire proofing. The project will be constructed under coordinated, concurrent multiple contracts including HVAC, General, and Electrical Construction Contract Work
Status
Bidding Closed
Prebid Date | 11/21/24 8:30pm |
Bid Date | 12/4/24 11:00am |
Location
1425 Main Street, Niagara Falls, New York 14305
RFI's will be accepted until end of business day 11/25/24
This project requires a non-refundable fee of $200 made payable to Avalon.
Electronic download option available for a non-refundable fee of $49 made payable to Avalon.
Spec book can be ordered individually from all other files for: $125.
Partial sets of drawings may be ordered as follows:
General: $10
Hazardous Materials: $20
Architectural: $30
Mechanical: $35
Electrical: $30