Kenmore Police Department - Phase 2

The Kenmore Police Department project is a complete tear down of the existing Kenmore Police Station and the utilization of the existing property to build a new Police Station. The new ballistically rated (UL752 – Level 3) building will be a masonry load bearing system clad in face brick, stone, and ACM panel systems. The new Station will house the Kenmore Police Department and will include a new firing range
Addendum 01 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
21067.01 Kenmore Police Phase 2 - Addendum No. 1 - Cover Sheet 2.0 MB
Drawings 16.8 MB
Specifications 467.7 KB
Addendum 02 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
21067.01 Kenmore Police Phase 2 - Addendum No. 2 - Cover Sheet and RFI responses 696.7 KB
Drawings 23.2 MB
Specifications 1.1 MB
Addendum 03 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Access Control Reference Documentation 10.3 MB
Addendum 3_Complete 319.3 KB
Drawings 14.0 MB
Specifications 791.3 KB
Post Bid Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Post Bid Addendum 1_Complete 122.9 KB