Lehigh Valley Section House: Exterior Asbestos Abatement Phase 2
At the Lehigh Valley Section House, the work scope includes the following: Stabilization of the existing asbestos-containing exterior stucco, including cutting of new expansion joints in the stucco and remediation of cracking. Stucco and other asbestos-containing materials at window and door jambs and heads are also to be removed. Other miscellaneous work is also to occur as shown on the drawings.
Specs
(click to expand/collapse)

Name | Size | ||
29976-1_OUTPUT_Spec | 16.0 MB |