Lehigh Valley Section House: Exterior Asbestos Abatement Phase 2
At the Lehigh Valley Section House, the work scope includes the following: Stabilization of the existing asbestos-containing exterior stucco, including cutting of new expansion joints in the stucco and remediation of cracking. Stucco and other asbestos-containing materials at window and door jambs and heads are also to be removed. Other miscellaneous work is also to occur as shown on the drawings.
Status
Bidding Closed
Prebid Date | 3/28/23 10:00am |
Bid Date | 4/5/23 2:00pm |
Company & Contacts
Flynn Battaglia Architects
Lauren M. Kaufmann
716-854-2424; lkaufmann@flynnbattaglia.com
Location
150 MILTON STREET, WILLIAMSVILLE, NY
This job requires a nonrefundable fee made payable to Avalon.
An electronic download is available made payable to Avalon.