Public Projects

Bids Due in 33 days
1/23/25 11:00am
BSA Cornelius Creek CSO Backwater Gate Flooding Mitigation Project
Bids Due in 33 days
Wendel Companies
Buffalo, New York
Installation of two motorized gates to the exterior of the existing structure at Cornelius Creek (CSO 055) outfall
Bids Due in 31 days
1/21/25 1:00pm
Warsaw CSD 2023 Capital Improvement Project
Bids Due in 31 days
Young + Wright Architectural
Warsaw CSD MSHS, Elementary, District Office, and Bus Garage
General Trades, Roofing, Plumbing, HVAC, Electrical, and Site Prime contracts
Bids Due in 34 days
1/24/25 11:00am
Royalton Phase 16 Waterline Project
Bids Due in 34 days
GHD Group
Town of Royalton
Replacement of 25,600 LF of watermains located in the Town of Royalton along Ditch Road and North and South portions of Akron Road
Bids Due in 25 days
1/15/25 11:00am
Augspurger Parking Ramp Repair & Restoration
Bids Due in 25 days
CPL Architects + Engineers
362 Pearl St. Buffalo, New York 14202
THIS PROJECT CONSISTS OF, BUT IS NOT LIMITED TO, THE COMPREHENSIVE REPAIR AND RESTORATION OF AN EXISTING MULTI-STORY PARKING GARAGE. THE SCOPE OF WORK INCLUDES VARIOUS CONCRETE REPAIRS, DRAINAGE PIPE REPLACEMENTS, PAINT AND SEALANT REPAIRS, BRICK REPAIRS, EPOXY REPAIRS, TRAFFIC DECK MEMBRANE APPLICATION, NEW STEEL CORBELS AND THE CONSTRUCTION OF A NEW ENTRANCE/EXIT LANE TO IMPROVE THE ACCESSIBILITY AND OVERALL FUNCTION. THE PROJECT AIMS TO EXTEND THE LIFESPAN OF THE PARKING STRUCTURE. ALL REPAIRS AND MODIFICATIONS SHALL BE EXECUTED WITH MINIMAL DISRUPTION TO THE ONGOING USE OF THE FACILITY. ALL CLOSURES TO DRIVE LANES AND PARKING SPACES MUST BE COORDINATED WITH OWNER AND PROJECT ENGINEER
Bids Due in 26 days
1/16/25 2:00pm
Warren Community and Workforce Education Center Third Floor Renovations
Bids Due in 26 days
LaBella Associates
300 Second Avenue, Warren, PA 16365
Comprehensive renovations to the third floor of the Warren Community Workforce Education Center
Bids Due in 19 days
1/9/25 2:00pm
23018 Erie 1 BOCES Fire Suppression Updates
Bids Due in 19 days
Young + Wright Architectural
E1B Harkness, Kenton and Potter CTC
Replacement of existing fire suppression in culinary and automotive shops
Bids Due in 10 days
12/31/24 2:00pm
Village of Tully WWTP Influent Pump Station Improvements - 2024
Bids Due in 10 days
MRB Group
Village of Tully, New York; Wastewater Treatment Plant
Influent pump station improvements
Bids Due in 47 days
2/6/25 2:00pm
Chautauqua Water District No. 2 - Contract No. 2 Water Supply Project
Bids Due in 47 days
Ramboll
Town of Chautauqua, New York
Project includes the construction of a new groundwater supply system consisting of but not limited to: two (2) submersible well pumps and motors with pitless adapters, two (2) new pre-engineered, pre-cast concrete buildings: 1,000-square foot water treatment plant building and 150-square foot re-chlorination, 15,000-gal bolted steel tank with passive mixing system and foundation, a standby natural gas generator and concrete pad, altitude valve vault, interior and exterior piping and valves, and associate site work. Exterior piping includes a horizontal directional drilled section below the wetlands between the well site and the water treatment building. The water treatment building will house a packaged 150-gpm capacity dual softener system, two (2) inline centrifugal high lift pumps, tablet disinfection system, process piping and valves, and associated electrical and instrumentation and controls systems. The re-chlorination building will house a 100-gal sodium hypochlorite tank and metering pumps, process piping and valves, relocated existing and associated electrical and instrumentation system. This project also includes the abandonment and/or demolition of the existing surface water treatment building and its contents, existing fiberglass clearwell tanks, and piping systems. The project includes separate prime contracts for General and Electrical work
Bids Due in 25 days
1/15/25 2:00pm
121037-02 - SUCF Renovate Maxcy Hall - Field House
Bids Due in 25 days
Mach Architecture
Maxcy Hall at SUNY Potsdam, Potsdam, NY
Renovation Project. Replace field house floor slab and athletic flooring. Construct a two-stop elevator. Toilet Room Renovations. Interior Finishes. MEP upgrates, and more.
Bids Due in 47 days
2/6/25 2:00pm
Chautauqua Water District No. 2 - Contract No. 3 Waterline
Bids Due in 47 days
Ramboll
Town of Chautauqua, New York
Construction of approximately 11,700 linear feet of 8-inch high density polyethylene (HDPE) potable water main, including fire hydrants, isolation gate valves and other appurtenances, along Springbrook Road and East Lake Road.