BSA Cornelius Creek CSO Backwater Gate Flooding Mitigation Project

Installation of two motorized gates to the exterior of the existing structure at Cornelius Creek (CSO 055) outfall

Status

Accepting Bids

Prebid Date 1/8/25 10:00am
Bid Date 1/23/25 11:00am

Company & Contacts

Wendel Companies
Kate Handrich  
(716)-688-0766

Location

Buffalo, New York

PB RFI's are due by: 1/15/2025 at 5:00PM EST.


This project requires a non-refundable fee of $185 made payable to Avalon.

Electronic download option available for a non-refundable fee of $49 made payable to Avalon.