BSA Cornelius Creek CSO Backwater Gate Flooding Mitigation Project
Installation of two motorized gates to the exterior of the existing structure at Cornelius Creek (CSO 055) outfall
Status
Accepting Bids
Prebid Date | 1/8/25 10:00am |
Bid Date | 1/23/25 11:00am |
Location
Buffalo, New York
PB RFI's are due by: 1/15/2025 at 5:00PM EST.
This project requires a non-refundable fee of $185 made payable to Avalon.
Electronic download option available for a non-refundable fee of $49 made payable to Avalon.