Channing H. Philbrick Park Elevated Walkway Replacement
Demolition of wood & aluminum pedestrian walkways and construction of a new 6-ft. x 511-ft. continuous pedestrian walkway supported by an embedded pile system
Status
Accepting Bids
Prebid Date | 10/23/24 2:00pm |
Bid Date | 11/8/24 11:00am |
Location
Channing H. Philbrick Park Trail, Penfield, New York
This project requires a non-refundable fee of $120 made payable to Avalon.
Electronic download option available for a non-refundable fee of $49 made payable to Avalon.